《悠久星光》施工進度 2011/08/03 光石安裝 Installation of 光石

重新處理過的光石紅銹鐵板再次運到現場
The rusted iron plates after several times of sandblasting, finally transfer back to the site.
說明箱移至現場
Moving the caption box back to the site
說明箱在存放期間,被不知名的人士滴到強力膠
Damage of our caption plate by unknown person with superglue. 
因為基地移設關係,所有光纖都必須剪斷、重新安裝,以確保光纖長度符合移設地點
Cutting off and re-installing the optic fiber to ensure the length is suitable for this new location.
新運來的光纖=更多支出的經費
New optic fiber = more cost of $$$
因為拆除作品及之前連續的大雨,導致作品表面毀損,經重新表面噴砂處理後,卻讓原先已經安裝的燈罩被侵蝕,金錢上的損失都不及我們心痛的程度!
Damage of rusted iron plates due to the removal and non-stopping raining, restoring the plate surface by sandblasting which caused another damage to the installed terminal fixtures.
More money wasting and heart breaking.
更換新的燈罩
Replacement of the new 
terminal fixtures.
光石上所有的燈罩都全數更新
Renewing the overall terminal fixtures on 光石
嚴重侵蝕
Serious erosion
光纖重新配線完畢
Rewiring the optic fiber
開始拉線
Wiring work on site
第二塊光石板
Second rusted iron plate
因為基地移設關係,所有光纖都必須剪斷、重新安裝,以確保光纖長度符合移設地點
Cutting off and re-installing the optic fiber to ensure the length is suitable for this new location.
燈罩毀損
Damage of terminal fixtures
更換新的燈罩
Replacement of the new 
terminal fixtures.
光纖重新配線完畢
Rewiring the optic fiber
安裝插座
Pipeline work finished and installing socket
作品定位(大)
Fixed position (Large plate)
作品定位(小)
Fixed position (small plate)
安裝光纖管線中
Installing optic fiber lines
安裝動力系統
Power Installation
固定基座
Welding foundation
光纖配線完成
Lining up
光點製作
Lighting point
安裝光源機
Installation of Lighting control box
燈光測試1
Light test 1
燈光測試2
Light test 2
安裝完畢
終わりました~