| 重新移設光石至廣場草坪區 Re-installation of 光石 at the lawn area |
| 現場確認作品安裝位置與細節 Double check the installation positions and construction details |
| 放樣 Mock-up |
| 基地開挖 Excavation |
| 基地開挖 Excavation |
| 安裝管線 Pipe work installation |
| 安裝管線 Pipe work installation |
| 打磨壓克力燈柱 sanding the acrylic cylinder |
| 抽換打磨好的壓克力燈柱 Replaced the sanded cylinder |
| 確認燈光效果 Lighting test |
| 安裝基座、灌漿 Foundation install and grouting |
| 場地復舊 Restoration the site |
| 場地復舊 Restoration the site |
| 灌漿完成、養護 Grouting completion and recovering |